Hyatt ABIA
|
Owner: Journeyman Construction
Location: Austin, TX
Total Construction:
Job Start Date:
Scheduled Completion: Project Description: Installation of Site Utilities for New Construction Hotel Project
|
Southpark Crossing Apartments
|
Owner: Journeyman Construction
Location: Austin, TX
Total Construction:
Job Start Date: 10/2015
Scheduled Completion: 04/2016 Project Description: Installation of +/- 12,450 lf of Fireline, Domestic Water, Wastewater, & Drainage Utilities
|
Round Rock High School Ph 3B
|
Owner: Lee Lewis, Inc.
Location: Round Rock, TX
Total Construction:
Job Start Date: 01/2016
Scheduled Completion: 04/2016 Project Description: Installation of +/- 1,950 lf of Fireline, Domestic Water, Wastewater, & Drainage Utilities
|
Powell Plaza
|
Owner: Austin Refrigeration
Location: Austin, TX
Total Construction:
Job Start Date: 12/2015
Scheduled Completion: 01/2016 Project Description: Installation of Fire Hydrant, wastewater connection, & Water services.
|
Cypress Creek Apartment
|
Owner: Bonner Carrington Construction
Location: Royse City, TX
Total Construction:
Job Start Date: 10/2015
Scheduled Completion: 06/2016 Project Description: Installation of Fireline, Domestic Water, Wastewater, & Drainage Utilities
|
Park Crest Middle School
|
Owner: Bartlett Cocke
Location: Pflugerville, TX
Total Construction:
Job Start Date: 11/2015
Scheduled Completion: 08/2016 Project Description: Installation of +/- 1,000 lf of Fireline, Irrigaiton, Wastewater, & Drainage
|
Crystal Falls Town Center
|
Owner: Ridgemont
Location: Leander, TX
Total Construction:
Job Start Date: 11/5/2015
Scheduled Completion: 06/2016 Project Description: Installation of +/- 8,750 lf of Fireline, Domestic Water, Wastewater & Drainage
|
Llano ISD 2014 Bond Package
|
Owner: Gallagher Construction Services
Location: Llano, TX
Total Construction:
Job Start Date: 05/2015
Scheduled Completion: 05/2016 Project Description: Installation of +/- 10,000 lf of Fireline, Domestic Water & Wastewater, & Drainage
|
Andrews Elementary School
|
Owner: Rogers-O'Brien Construction
Location: Austin, TX
Total Construction:
Job Start Date: 8/2015
Scheduled Completion: 9/2015 Project Description: Modify/Abandon existing fireline
|
Staybridge Suites
|
Owner: MKM Hotel Group, LLP
Location: Austin, TX
Total Construction:
Job Start Date: 9/2014
Scheduled Completion: Project Description: Installation of Fireline, Domestic Water, Wastewater, & Drainage Utilities
|
We Rent it -- Schertz
|
Owner: Jacody
Location: Schertz, TX
Total Construction:
Job Start Date: 8/2015
Scheduled Completion: 9/2015 Project Description: Installation of 1 ea Fireline Services
|
Herman Schieffer House
|
Owner: ASD Consultants
Location: Austin, TX
Total Construction:
Job Start Date: 6/2015
Scheduled Completion: 7/2015 Project Description: Installation of 2 ea Water Services
|
Jack in the Box - Berkman
|
Owner: VWC Builders
Location: 6800 Berkman Dr.
Total Construction:
Job Start Date: 5/2016
Scheduled Completion: 7/2016 Project Description: Installation of +/- 300 lf of Sanitary Sewer, and Water Services
|
South Shore Pointe
|
Owner: Intowne Homes
Location: Austin, TX
Total Construction:
Job Start Date: 4/2015
Scheduled Completion: 8/2015 Project Description:
|
We Rent It -- Buda
|
Owner: Jacody
Location: Buda, TX
Total Construction:
Job Start Date: 4/2015
Scheduled Completion: 5/2015 Project Description:
|
Georgetown Village Oaks
|
Location: Georgetown, TX
Total Construction:
Job Start Date:
Scheduled Completion: Project Description:
|
Pipeline Encasement at I35 and Bud Stockton Loop
|
Owner: Brazos River Authority
Location: Jarrell, Texas
Total Construction: $498,735.00
Job Start Date: January, 2015
Scheduled Completion: March, 2015 Project Description: Relocation of 230LF of 48in CSC raw water pipeline.
|
Walnut Creek Bank Stabilization/FM Relocation
|
Owner: Austin Filter Systems/City of Austin
Location: Austin, Texas
Total Construction:
Job Start Date: Novemenber, 2014
Scheduled Completion: December 2014 Project Description: Relocation of 320Lf of 24in HDPE force main across Walnut Creek.
|
Welsh Plant Storm Drain Tunnel
|
Owner: Brasfield and Gorie
Location: Pittsburg, Texas
Total Construction:
Job Start Date: December 2014
Scheduled Completion: December 2014 Project Description: Installation of 80LF of 52in tunnel/installation of 42in carrier pipe.
|
Public Safety Trainig Facility WW Line
|
Owner: City of Georgetown
Location: Georgetown, Texas
Total Construction: $913,950.00
Job Start Date: Novemenber, 2014
Scheduled Completion: March, 2015 Project Description: Installation of approx. 2,200LF of 8in WW Pipeline and 1,520LF of 8in to 10in pipe bursting.
|
Villages of Melissa Ph. 2B & 2C
|
Owner: D.R. Horton
Location: Melissa, Tx
Total Construction:
Job Start Date: 12/1/14
Scheduled Completion: 5/14/14 Project Description: Residential site development project consisting of 110 residential lot. The project consist of approximately 4,000lf of 8” & 12” sewer, 5,000lf of 14”, 12”, 8” water as well as 3,500lf of 7’x5’ RCB – 18” RCP and associated concrete structures.
|
Juniper Townhomes
|
Owner: Intown Homes
Location: Austin, TX
Total Construction:
Job Start Date: December 2014
Scheduled Completion: April 2015 Project Description: Install Water, Sanitary, & Drainage for 16 luxury Townhomes.
|
Pearson Place Lift Station & WW Improvements
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $3,517,671.00
Job Start Date: June, 2014
Scheduled Completion: March, 2015 Project Description: The Work of this Contract comprises the construction of a 500 gpm lift station with 16-ft diameter
polymer wet well, approximately 2,660 lf of 24-in gravity wastewater main with 670 lf of 42-in jack
and bore, 1,950 lf of 12-in gravity wastewater main with 140 lf of 24-in jack and bore, 3,850 lf of
8-in force main with 600 lf jack and bore, and 1,700 lf of 2-in waterline and 105 lf of ¾-in waterline.
|
Kerrville VA Hospital SD Repair
|
Owner: Affiliated Western Construction
Location: Kerrville, Texas
Total Construction:
Job Start Date: May 2014
Scheduled Completion: June 2014 Project Description: Repair/Replace Storm Drain line segments at 3 locations at the Kerrville VA Hospital.
|
McNutt Creek WW Segment C9
|
Owner: City of Round Rock
Location: Round Rock, Texas
Total Construction: $2,092,349.50
Job Start Date: June 2014
Scheduled Completion: November 2014 Project Description: Installation of approx. 6,800LF of 27in WW main via open cut, and approx. 250LF of 24in WW main via jack and bore.
|
Corpus Christi Airport-48in Waterline Relocation
|
Owner: City of Corpus Christi/Bay Ltd.
Location: Corpus Christi, Texas
Total Construction: $2,007,404.00
Job Start Date: July 2014
Scheduled Completion: December 2014 Project Description: Relocation of 3891LF of 48in Bar Wrapped Concrete Cylinder Pipe for the extension of Runway 13-31 at Corpus Christi Airport.
|
Pollo Tropical - SA
|
Owner: Westmoreland Builders
Location: San Antonio, Texas
Total Construction:
Job Start Date: May 2014
Scheduled Completion: June 2014 Project Description: Install water, sewer and fireline service to a Pollo Tropical restaurant in San Antonio Texas.
|
South Texas Waterline Relocation for US 77
|
Owner: South Texas Water Authority
Location: Robstown, Texas
Total Construction: $1,035,100.00
Job Start Date: February 20014
Scheduled Completion: May 2014 Project Description: The project consists of the construction of approximately 850 feet of new 42 inch diameter waterline, 100 feet of 54 inch diameter casing, and associated fittings and valves.
|
NTMWD UPRR Protection of exist 72in waterline
|
Owner: North Texas Municipal Water District
Location: Lake Texoma, Texas
Total Construction: $165,000.00
Job Start Date: November, 2013
Scheduled Completion: December, 2013 Project Description: This Project includes installation of 22 LF of either a 108” Tunnel Liner Plate or 108” Split Casing on an existing 72” PCCP (AWWA C-301) raw water pipeline at a Union Pacific rail crossing.
|
Mountain Creek Interceptor MC-5 and MC-6, Phase 2A
|
Owner: Trinity River Authority
Location: Dallas, Texas
Total Construction: $9,680,394.10
Job Start Date: January, 2014
Scheduled Completion: January, 2015 Project Description: The project consists of 2,486LF of 96IN and 6,395LF of 90IN WW Interceptor. Also included is 190LF by tunnel excavation, all associated manholes, a meter station and 2 junction boxes.
|
Bryker Woods Concrete Pressure Pipe Repairs Projec
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $481,225.00
Job Start Date: January, 2014
Scheduled Completion: April, 2014 Project Description: Project includes the repair of 2EA 54IN sections of PCCP by internal carbon fiber method. Also included is the replacement of 2EA segments of 36IN PCCP by means of open cut at 2 different locations.
|
Buttercup Creek WW Interceptor Replacement
|
Owner: City of Cedar Park
Location: Cedar Park, Texas
Total Construction: $3,137,608.00
Job Start Date: November, 2013
Scheduled Completion: July 2014 Project Description: The Buttercup Creek WW Interceptor project includes approx. 6,900LF of 30in and 1,460LF of 24in sanitary sewer line, as well as 8,330LF of 8in reclaimed water and associated appurtenances.
|
East Bank JB/Carver FM WW Imps
|
Owner: City of Waco
Location: Waco, Texas
Total Construction: $514,388.00
Job Start Date: September, 2013
Scheduled Completion: February, 2014 Project Description: Project involved installation of 42in, 36in interceptor as well as modifications to existing 24in force mains. A 10 foot diameter drop manhole and concrete receiving structure will also be installed. Project also includes bypass pumping/dewatering/special shoring.
|
60in Transmission Main
|
Owner: City of Laredo
Location: Laredo, Texas
Total Construction: $15,478,113.00
Job Start Date: June 2013
Scheduled Completion: July 2014 Project Description: Installation of approx 32,000LF of 60in steel water transmission main, and all valves, tunnels, and other appurtances. Project is being performed under subcontract for Mountain Cascade of Texas, with both contractors performing approx half of the project.
|
Road Widening for W Britton Rd. and 42in Water Tra
|
Owner: Cityo of Oklahoma City/OKC Utility Trust
Location: Oklahoma City, Oklahoma
Total Construction: $7,804,675.00
Job Start Date: June 2013
Scheduled Completion: July 2014 Project Description: Project includes approx. 7,000LF of 42in water transmission main extension. Also included is the widening of Britton Rd. from 2 lanes to 4 lanes, including all storm drain, and all other utility relocations associated with road widening.
|
CRWS WF-6 & WF-14 Relief Interceptor
|
Owner: Trinity River Authrity
Location: Arlington, Texas
Total Construction: $3,268,688.40
Job Start Date: July 2013
Scheduled Completion: April 2014 Project Description: Quantities included with this project include 300LF of 54in FRP, 4,400LF of 48in FRP, 500LF of 24in PVC, 2,500LF of 21in PVC, 500LF of 18in PVC, 250LF of 20in DIP, and 200LF of 16in DIP Wastewater Line. Also included are 250 TRA standard manholes, 3 junction structure and 1 sanitary sewer metering station.
|
Southwest Pipeline PH III and Inline Booster Pump
|
Owner: Upper Trinity Regional Water District
Location: Lewisville, Texas
Total Construction: $4,548,548.70
Job Start Date: April 2013
Scheduled Completion: November, 2014 Project Description: Project includes 6.057lf of 36in, 5,502lf of 30in and 430lf of 24in ductile iron water transmission main. Also included is the construction of an inline booster pump station.
|
Cottonwood Creek Wastewater Collection System PH.
|
Owner: City of Cedar Park
Location: Cedar Park, Texas
Total Construction: $2,044,523.00
Job Start Date: February 2013
Scheduled Completion: July 2013 Project Description: Project includes construction of approx. 4,700lf of 36in WW main, including 650lf of trenchless; 350lf of 18in WW main; 410lf of 6in and 8in WW service lines; and appurtenances from the North Brushy Creek Interceptor at RM 1431 to 700lf south of Ronald Reagan and CR 272.
|
Brushy Creek Interceptor Ph 1 & Ph 2B Project
|
Owner: Hutto Mezz Holdings LLC
Location: Hutto, Texas
Total Construction: $1,110,850.00
Job Start Date: January 2013
Scheduled Completion: May 2013 Project Description: Construction of Approx. 3650LF of 42in WW Interceptor along Brushy Creek. Connection to an exist. lift station.
|
Salatrillo Reuse Pipeline Project
|
Owner: San Antonio River Authority
Location: San Antonio, Texas
Total Construction: $2,678,660.20
Job Start Date: March 2013
Scheduled Completion: November 2013 Project Description: Construction of Approx. 20,000LF of 12in Reuse Water Main, including 5,494Lf by HDD. Project also includes 1,649LF 12in Main installed by auger bore.
|
72in Waterline to Falcon Heavy Flame Trench
|
Owner: Space Exploration Technologies
Location: McGregor, Tx.
Total Construction: $700,000.00
Job Start Date: October 2012
Scheduled Completion: November 2012 Project Description: Installation of 600Lf of 72in steel and 30in ductile to serve Falcon Heavy Flame Trench for Space Exploration Technologies (Space X).
|
City of Austin Emergency Interconnect
|
Owner: Travis Co. WC&ID No.17
Location: Austin, Texas
Total Construction: $893,061.00
Job Start Date: July 2012
Scheduled Completion: December 2012 Project Description: The project includes the installation of approximately 4,900LF of16-inch waterline along RM 620, meter assembly, three seperate bores, and related improvements and appurtenances.
|
PH 2 Inverted Siphon Improvements
|
Owner: Oklahoma City WaterUtility Trust
Location: Oklahoma City, Oklahoma
Total Construction: $6,068,521.00
Job Start Date: November 2012
Scheduled Completion: July 2013 Project Description: The project includes approx 2465LF of 72in FRP interceptor. Also included is 587LF of parallel 24in and 48in FRP siphon lines crossing the Oklahoma River. Project also includes 10 Junction Structures over/around both new and existing lines.
|
Wells Branch MUD 12-inch WW Line Relocation
|
Owner: Wells Branch Municipal Utility Dist.
Location: Austin, Texas
Total Construction: $697,509.50
Job Start Date: August, 2012
Scheduled Completion: November, 2012 Project Description: The work includes the installation of approximately 2,650 feet of 15in WW line, includingapproximately 920 feet installed in two bores, manholes, erosion control, traffic control, appurtenances, the removal and replacement of portions of an existing 12in WW line with 15in line, and the abandonment of portions of an existing 12in WW line, all while maintaining the existing WW service, along the east side of the North bound MoPac frontage road in the Wells Branch MUD in Travis County, Texas.
|
Quiet Creek 16in Oversize Water Main Phase 1
|
Owner: San Antonio Water Systems
Location: San Antonio, Texas
Total Construction: $570,148.50
Job Start Date: October 2012
Scheduled Completion: January 2013 Project Description: construction of approximately 2,785 linear feet of 16-inch water main by direction bore. Open Cut Tie-in's on both ends of line.
|
Bird Creek WW Replacement Ph. 2A
|
Owner: City of Temple
Location: Temple, Texas
Total Construction: $919,986.00
Job Start Date: February, 2012
Scheduled Completion: June, 2012 Project Description: Project includes approx 1,00LF of 30in graity WW Interceptor. 261LF will be insalled by bore. The project runs near an existing creek, and across several parking/driveway areas. This project will take careful coordination with landowners/public.
|
Wylie/Rockwall/Farmersville 36in Pipeline Reloc.
|
Owner: North Texas Municipal Water District
Location: Wylie, Texas
Total Construction: $311,485.00
Job Start Date: February 2012
Scheduled Completion: April 2012 Project Description: This project includes approximately 313 LF of 36in Water Line and appurtenances to be relocated, along with installation of two 36in butterfly vavles.
|
Church Street LS Force Main Repair
|
Owner: City of Waco
Location: Waco, Texas
Total Construction: $92,260.00
Job Start Date: December, 2011
Scheduled Completion: January, 2012 Project Description: The City of Waco has awarded Lewis Contractors Inc. an emergency contract to repair the Church Street LS Force Main. Four Thurst Restraint Blocks will be installed to hold the line in place, then a 10in bypass line will be installed and put into service in order for the repair to be made. The repair will be made by using 2ea hydrastops to block flow in the line while the 12in ductile pipe is repaired.
|
IH-45 to SWTP Sanitary Sewer Main Rehab. Proj.
|
Owner: City of Conroe
Location: Conroe, Texas
Total Construction: $6,692,500.00
Job Start Date: January 2012
Scheduled Completion: December 2012 Project Description: This project includes the rehabilitation of 12,900lF of 54in by 48in slipline and 5,500LF of 60in by 54in slipline. Existing line will be sliplined using Hobas low profile bell pipe. The removal/replacement of 44ea 96in diameter manholes is also included, along with all bypass pumping, dewatering, etc. needed to complete project.
|
WHCRWA Contract 22A2
|
Owner: West Harris County Regional Water Authority
Location: Harris County, Texas
Total Construction: $3,482,335.00
Job Start Date: January 2012
Scheduled Completion: October 2012 Project Description: This project includes the construction of approximately 4,870 LF of 42-inch waterline and necessary appurtenances and installation of meter and pressure/flow control stations.
|
Precinct Line Road Water Line
|
Owner: Trinity River Authority
Location: Tarrant County
Total Construction: $890,565.50
Job Start Date: July 2011
Scheduled Completion: Nov 2011 Project Description: The project includes construction of a new 30-inch water line approximately 1,500 LF which starts at the existing Glade Road Booster pump station, crosses a DART right-of-way, crosses Precinct Line Road, then runs alongside Precinct Line Road ultimately terminating at Rumfield Road.
|
WTP4 S313
|
Owner: City of Austin/KST Electric
Location: Austin, Texas
Total Construction:
Job Start Date: February 2012
Scheduled Completion: November 2012 Project Description: Installation of approx. 7000 LF of 30 in - 84 in mortar coated steel yard piping.
|
Retreat at San Marcos
|
Owner: Retreat Partners, LLC
Location: San Marcos, Tx
Total Construction: $1,673,243.00
Job Start Date: 9-19-11
Scheduled Completion: 2-15-12 Project Description: G.C.: Collegiate Construction, LLC
Water, Wastewater, Storm Sewer
|
Pflugerville Elementary School #19
|
Owner: Pflugerville ISD
Location: Pflugerville, Tx
Total Construction: $466,179.00
Job Start Date: 10-3-11
Scheduled Completion: 3-15-12 Project Description: Water, Wastewater, Storm Sewer, Gas, Sleeves
|
Texoma Pipeline Section I Improvements Project
|
Owner: North Texas Municipal Water District
Location: Lake Texoma, Tx
Total Construction: $3,928,252.00
Job Start Date: Oct 2011
Scheduled Completion: April 2012 Project Description: This job consists of:
1. All pipeline dewatering, pipeline filling, and surface restoration operations necessary to
complete the work.
2. All dam excavation and reconstruction to dewater an existing stock tank for bends B8
and B9 replacement as well as filling of the stock tank from the blow off valve located
next to the tank.
3. Replacement of existing 72‐inch pre‐stressed pipe joints at the 11 bend locations
identified with new mortar coated steel pipe.
4. Construction of vault and replacement of existing pre‐stressed pipe with 72 and 84‐inch
mortar coated steel pipe and an epoxy coated spool piece as shown for a pig launching
facility.
5. Installation of an 84‐inch mortar coated lateral and associated fittings on an existing
mortar coated steel pipe for a pig retrieval location.
6. Carbon Fiber Reinforce Polymer lining on an existing 72‐inch pre‐stressed pipe at two
bend locations.
7. Welding of existing joints on the existing 72‐inch pre‐stressed pipeline at one bend
location.
8. Cleaning of the interior of the existing 84‐inch and 72‐inch pipeline in areas where
pipeline pigging operations cannot reach to remove zebra mussel build up. For
example, all areas upstream and downstream of the pig insertion and retrieval points
will need to be cleaned manually. All outlets on the pipeline and two inline butterfly
valves will be cleaned. In addition, all pump station piping up to the pumps will be
cleaned and the pump screens in the lake will be cleaned which will require divers.
9. Replacement of existing air valves with new air valves.
10. Pumping of low spots on the pipeline that are not drained by blow off valves, and
cleaning these low spots.
11. Pigging of approximately 10‐miles of 72‐inch pipeline to remove any zebra mussels from
the pipeline interior.
12. Pigging water collection basin, approximately 1,700 linear feet of 42” HDPE pipe,
discharge works, and collection basin at the Sherman Water Treatment Plant to detain
the pigged water.
|
54-inch Lake Shore Drive Bore
|
Owner: City of Waco
Location: Waco, Texas
Total Construction: $549,349
Job Start Date: September 2011
Scheduled Completion: December 2011 Project Description: 190lf of 72 inch tunnel with 265lf of 54 inch RCP with associated headwalls, rip rap & grouting of the existing storm sewer system.
|
Texas State North Stadium Expansion
|
Owner: Texas State University
Location: San Marcos, Texas
Total Construction: $214,275.00
Job Start Date: 1 July 2011
Scheduled Completion: 1 November 2011 Project Description: Water, Wastewater, Storm Sewer
|
Firestone – Stone Creek Crossing
|
Owner: Direct Development
Location:
Total Construction: $235,061.00
Job Start Date: 1 July 2011
Scheduled Completion: 15 August 2011 Project Description: Water, Wastewater, Storm Sewer
|
HEB - Belton
|
Owner: HEB
Location: Belton, Texas
Total Construction: $784,272.00
Job Start Date: 15 May 2011
Scheduled Completion: 31 August 2011 Project Description: Water, Wastewater, Storm Sewer
|
Crossroads Centre
|
Owner: Claremont Property Co.
Location:
Total Construction: $467,307.00
Job Start Date: 15 April 2011
Scheduled Completion: 15 August 2011 Project Description: Water, Wastewater, Storm Sewer
|
Wastewater Treatment and Recycling Center Intercep
|
Owner: City of Boerne
Location: Boerne, Texas
Total Construction: $3,495,590
Job Start Date: September 2011
Scheduled Completion: May 2012 Project Description: Approximately 200 linear feet of new 8 inch sanitary sewer main, approximately 5,900 linear feet of new 24 inch sanitary sewer main, approximately 1,100 linear feet of new 48 inch sanitary sewer and approximately 900 linear feet of new 54 inch sanitary sewer main will be installed to convey wastewater to the proposed Wastewater Treatment and Recycling Center(WWTRC). Also included is approximately 1,400 linear feet of new 36 inch WWTRC effluent pipe and approximately 6,800 linear feet of new 12 inch re-use water main. Approximately 300 linear feet of sanitary sewer main and re-use water main will be installed via horizontal auger boring.
|
S. Presa St. 48 Inch Siphon #6 Project
|
Owner: San Antonio Water System
Location: San Antonio, Texas
Total Construction: $554,488
Job Start Date: August 2011
Scheduled Completion: February 2012 Project Description: Replacement of approximately 230 linear feet of 48 inch sanitary sewer siphon main within South Presa Street - TXDOT Right of Way(SPUR 122), using jack and bored method, open cut method, removal of existing 48 inch concrete siphon pipe and adding 2 t-base manhole. Of these 230 linear feet, approximately 110 linear feet will be jack and bored - 60 inch steel casing, 48 inch FRP carrier pipe and 120 linear feet will be open cut - 48 inch FRP pipe. Improvements will also include complete restoration of jack and bore pit areas and bypass pump pit pipe repairs. Improvements include approximately 22 linear feet of 6 inch ductile iron water pipe and approximately 44 linear feet of 12 inch ductile iron water pipe for South Presa Street 48 Inch Siphon No. 6 Project, SAWS Job No. 11-4514.
|
LCRA Office Building
|
Owner: Amercan Constructors
Location: Austin, Texas
Total Construction: $708,000.00
Job Start Date: January 2011
Scheduled Completion: May 2011 Project Description: Fire Line, Domestic Water, Wastewater, Storm Sewer installation.
|
North Ft. Bend Segment 3
|
Owner: North Ft. Bend Water Authority
Location: Ft. Bend Co., Texas
Total Construction: $2,376,184.00
Job Start Date: March 2011
Scheduled Completion: September 2011 Project Description: Install approx. 8,511 of 42in steel water transmission main.
|
Wylie to Garland 42 Inch Water Line Location
|
Owner: North Texas Municipal Water District
Location: Wylie, Texas
Total Construction: $2,192,992.00
Job Start Date: February 2011
Scheduled Completion: June 2011 Project Description: The project includes 3200LF of 42-inch treated water transmission main and appurtenances.
|
Bull Hide Creek Interceptor
|
Owner: Waco Metropolitan Area Regional Sewerage System
Location: Waco, Texas
Total Construction: $3,435,199.00
Job Start Date: January 2011
Scheduled Completion: August 2011 Project Description: The project includes 12,397LF of 24in, 5,797LF of 18in Gravity WW Interceptor. There are 48 Manholes including an energy asorbing and a metering manhole. Also included in the project is 7,282LF of 12in reclaimed waterline installed parallel to the WW Line.
|
IH-45 Sanitary Sewer Line Rehabilitation
|
Owner: City of Conroe
Location: Conroe, Texas
Total Construction: $504,150.00
Job Start Date: December 2010
Scheduled Completion: February 2011 Project Description: Project consists of approximately 535LF of damaged 54in RCP to be slip lined with 48in Hobas reline pipe. The project also includeds 72in and 96in diameter fiberglass manholes, bypass pumping of the existing 54in wastewater line and dewatering applications.
|
North Ft. Bend Segment 5
|
Owner: North Fort Bend Water Authority
Location: Ft. Bend Co., Texas
Total Construction: $2,280,506.50
Job Start Date: November, 2010
Scheduled Completion: June, 2011 Project Description: Construct approximately 12,850LF of 20in ,24in and 42in waterline including valves, fitting, service manholes, and other appurtenances.
|
Wildhorse Ranch N. Interceptor Extension
|
Owner: City of Austin
Location: Manor, Texas
Total Construction: $2,691,361.00
Job Start Date: October, 2010
Scheduled Completion: April, 2011 Project Description: Approximately 3,850LF of 42in WW Interceptor, including three trenchless operations, eight 8ft Diameter Manholes,etc.
|
Westside Water Treatment Plant 54IN Raw Waterline
|
Owner: City of Fort Worth
Location: Fort Worth, Texas
Total Construction: $2,268,084.00
Job Start Date: Oct. 2010
Scheduled Completion: Feb. 2011 Project Description: Construction of 4,850lf of 54IN RCCP Raw water pipeline with associated 54IN butterfly valves, Junction Structures, and Connection to Ex. 96IN Tarrant Regional Water District raw water pipeline.
|
Fitzhugh Branch Capital Improvement Project
|
Owner: Greater Texoma Utility Authority/City of Melissa
Location: Melissa, Texas
Total Construction: $1,708,529.71
Job Start Date: Aug. 2010
Scheduled Completion: Jan. 2011 Project Description: Construction of 3,745lf of 21? Sewer, 5,356lf of 18? Sewer and 2,241lf of 16? Potable Water. With associated Bores under State HWY 121, Manholes and rock excavation. The projects average depth is 25? deep with the deepest area being 35? feet in depth.
|
Gilbert Elem. School
|
Owner: American Constructors
Location: Del Valle, Texas
Total Construction: $817,000
Job Start Date: August, 2010
Scheduled Completion: January, 2011 Project Description: Fire Line, Domestic Water, Wastewater, Storm Sewer, Water Quality Ponds, Lift Station
|
Lakeway Regional Medical Center
|
Owner: Hoar Construction
Location: Lakeway, Texas
Total Construction: $618,000
Job Start Date: July 2010
Scheduled Completion: November, 2010 Project Description: Fire Line, Domestic Water, Wastewater, Storm Sewer
|
IBC Equity
|
Owner: Marshall Company
Location:
Total Construction: $75,000
Job Start Date: July 2010
Scheduled Completion: September 2010 Project Description: Fire Line, Domestic Water, Wastewater, Water Quality Pond
|
Anson Wastewater Treatment Plant
|
Owner: Ranger Excavating
Location: Anson, Texas
Total Construction: $577,545
Job Start Date: January 2010
Scheduled Completion: August 2010 Project Description: Wastewater line installation.
|
RM 1431 24
|
Owner: City of Cedar Park/Hunter Ind.
Location: Cedar Park, Texas
Total Construction: >$200,000.00
Job Start Date: July, 2010
Scheduled Completion: August, 2010 Project Description: Relocate and Reconnect an existing 24" Waterline due to higway widening. Project includes 300LF of 24" Ductile relocation, including 170LF of pipe installation in bore/casing.
|
River Ridge and RIver Down Lift Sta Decomission
|
Owner: City of Georgetown
Location: Georgetown, Texas
Total Construction: $414,032.00
Job Start Date: August, 2010
Scheduled Completion: December 2010 Project Description: Project includes the installation of 964LF of 10in WW line, including a 303LF of 20in bore under the San Gabriel River. Project will demolish and abandon 2 Lift Stations in the River Ridge subdivision.
|
Siena WW Lines D1,D2, & D4
|
Owner: Siena MUD/City of Round Rock
Location: Round Rock, Texas
Total Construction: $2,683,960.00
Job Start Date: April 2010
Scheduled Completion: August 2010 Project Description: Project includes 8715LF of 27in Hobas as well as Ultra Corr Waste Water Lines. Project also includes 1102LF of 36in Bore/Casing with 27in Hobas carrier pipe. There are 34EA 72in Manholes to be installed as well.
|
South I-35 Segment 11/12 - 42in Water Trans. Main
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $1,320, 233.00
Job Start Date: August, 2010
Scheduled Completion: January, 2011 Project Description: Installation of 3,127LF of 42in Water Transmission Main by open cut, as well as 340LF of 42in Water Main by 54in Dia. Bore. Project also includes a 12in PRV and multiple connections to existing lines.
|
48in Water Transmission Line Seg. 1A
|
Owner: North Fort Bend Water Authority
Location: Houston, Texas
Total Construction: $4,942,920.00
Job Start Date: Feb 10
Scheduled Completion: Nov 10 Project Description: Installation of 11,860LF of 48in Steel Water Main. Project begins at Old Richmond Rd. and ends at Bellaire Boulevard.
|
48 IN Water Trans Main
|
Owner: Oklahoma City Water Utilities Trust
Location: Oklahoma CIty, Ok
Total Construction: $5,796,516.50
Job Start Date: Feb 10
Scheduled Completion: Sep 10 Project Description: Installation of approx. 14,000LF of 48IN Ductile Iron Water Transmission Main along SW 164th Street from Telephone Road to Pennslvania Avenue.
|
Circle C Transmission Main
|
Owner: City of Austin/Stratus Properties
Location: Austin, Texas
Total Construction: $617,754.00
Job Start Date: Nov 09
Scheduled Completion: March 10 Project Description: Installation of 4,256LF of 16" Ductile Iron Water Trans. Main along Mopac frontage Rd. from Slaughter Ln. to LaCrosse Ave.
|
Wesleyan Assisted Living
|
Owner: VRW Construction
Location:
Total Construction: $235,000.00
Job Start Date: Dec 09
Scheduled Completion: June 10 Project Description: Fire Line, Domestic Water, Wastewater, Storm Sewer, Detention Pond
|
Gupton Stadium
|
Owner: Leander ISD/American Constructors
Location: Cedar Park, Texas
Total Construction: $1,333,000.00
Job Start Date: Nov 09
Scheduled Completion: Jun 10 Project Description: Fire Line, Domestic Water, Wastewater, Box Culvert, Storm Sewer.
|
HEB #12
|
Owner: SpawGlass
Location: Austin, Texas
Total Construction: $593,000.00
Job Start Date: Aug 09
Scheduled Completion: Apr 10 Project Description: Fireline, Domestic Water, Wastewater, Storm Sewer, Water Quality Pond.
|
ERCOT - Taylor
|
Owner: Austin Commercial
Location: Taylor, Texas
Total Construction: $135,000.00
Job Start Date: Aug 09
Scheduled Completion: February 10 Project Description: Fire Line, Domestic Water, Wastewater & Storm Sewer
|
Del Valle Middle School #3
|
Owner: Del Valle I.S.D./American Constructors
Location: Del Valle, Texas
Total Construction: $633,000.00
Job Start Date: July 09
Scheduled Completion: December 09 Project Description: Offsite Fireline, Domestic Water, Wastewater, Storm Water & Water Quality Ponds.
|
Hornsby Glen Offsite Waterline Extension
|
Owner: Main Street, Ltd.
Location: Austin, Texas
Total Construction: $1,419,246
Job Start Date: Feb 2009
Scheduled Completion: July 2009 Project Description: The work consists of 4,557 feet of 24" and 12" ductile iron pipe installation, including all valves, hydrants, etc. Project also includes multiple Jack/Bores including one bore under the Colorado river.
|
Dripping Springs High School Ph. 2
|
Owner: Dripping Springs ISD/American Const.
Location: Dripping Springs, Texas
Total Construction: >$900,000
Job Start Date: Feb 2009
Scheduled Completion: Sept 2009 Project Description: Installation of Fire Line, Domestic Water, Wastewater, Storm Sewer and Box Culvert systems.
|
Texas State Stadium Expansion
|
Owner: Texas State Univ/Austin Commercial
Location: San Marcos, Texas
Total Construction: <$250,000
Job Start Date: Feb 2009
Scheduled Completion: Apr 2009 Project Description: Installation of Fire Line, Domestic Water, Wastewater and Storm Sewer systems.
|
HEB Warehouse Expansion
|
Owner: HEB/Primus Builders, Inc.
Location:
Total Construction: >$50,000
Job Start Date: Jan 2009
Scheduled Completion: March 2009 Project Description: Fire Line, Wastewater installation.
|
Austin Avenue Phase 1
|
Owner: Lott Brothers
Location:
Total Construction: ,$350,000
Job Start Date: Feb 2009
Scheduled Completion: May 2009 Project Description: Fire Line, Domestic Water, Wastewater, Storm Sewer, Box Culverts, Detention Pond
|
Round Rock Technology Center
|
Owner: Round Rock ISD/Turner Construction
Location: Round Rock, Texas
Total Construction: $345,000
Job Start Date: Nov 2008
Scheduled Completion: March 2009 Project Description: Installation of Fire Line, Domestic Water, Wastewater, Storm Sewer and Stormceptors.
|
Central Texas Medical Center
|
Owner: BE&K Building Group
Location:
Total Construction: >$250,000
Job Start Date: Oct 2008
Scheduled Completion: Feb 2009 Project Description: Fire Line, Domestic Water, Wastewater, Storm Sewer
|
IBC Bank
|
Owner: Marshall Company
Location: Austin, Texas
Total Construction: <$250,000
Job Start Date: Dec 2008
Scheduled Completion: March 2009 Project Description: Fire Line, Domestic Water, Wastewater, Storm Sewer, Water Quality Pond
|
Bastrop ISD Stadium
|
Owner: Bastrop ISD/Drymalla Const.
Location: Bastrop, Texas
Total Construction: <$500,000
Job Start Date: Oct. 2008
Scheduled Completion: Feb 2009 Project Description: Installation of Fire Line, Domestic Water, Wastewater and Storm Sewer systems.
|
Green WTP Valve Isolation Package
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $584,615
Job Start Date: Nov 08
Scheduled Completion: Feb 09 Project Description: The project consists of isolation of: an existing 30-inch concrete steel cylinder (CSC) water main, an existing 24-inch cast iron (CI) water main, the east and west pump stations, the intake structure, service to the Maps & Records building, and service to the Storage Warehouse building.
|
Cedar Creek High School
|
Owner: Bastrop ISD/American Constructors
Location: Bastrop, Texas
Total Construction: $1,000,000
Job Start Date: August 2008
Scheduled Completion: November 2008 Project Description: Fireline, Domestic Water, Storm Sewer, Wastewater and Detention Ponds.
|
Manor Elementary School 2009
|
Owner: Manor ISD/Baird Williams Construction
Location: Manor, Texas
Total Construction: $290,000
Job Start Date: August 2008
Scheduled Completion: September 2008 Project Description: Fireline, Domestic Water, Wastewater and Storm Drain Systems.
|
LCRA 30" Waterline Relocate
|
Owner: LCRA
Location: Cedar Park, Texas
Total Construction: $190,000
Job Start Date: June 2008
Scheduled Completion: July 2008 Project Description: Relocation of approx. 850LF of 30" Ductile Iron Waterline. This line is the main water feed into Leander, therefore both tie in's had to be made at the same time with very little room for error. Both tie in's were completed ahead of schedule.
|
Vantage at Buda
|
Owner: Concept Builders
Location: Buda, Texas
Total Construction: $570,000
Job Start Date: June 2008
Scheduled Completion: September 2008 Project Description: Fireline, Domestic Waterline, Wastewater, Storm Sewer, and Detention Pond.
|
Colt Elementary School
|
Owner: Marble Falls ISD/Charter Builders
Location: Marble Falls, Tx.
Total Construction: $840,000
Job Start Date: July 2008
Scheduled Completion: November 2008 Project Description: Installing Fireline, Domestic Water, Wastewater, Storm Sewer and a Detention Pond.
|
Leander Middle School #7
|
Owner: Leander ISD/American Constructors
Location: Leander, Texas
Total Construction: $1,700,000
Job Start Date: June 2008
Scheduled Completion: October 2008 Project Description: Fireline, Domestic Water, Wastewater, Storm Sewer, Water Quality Pond and French Drain systems.
|
Domain II
|
Owner: Simon Properties/Beck Group
Location: Austin, Texas
Total Construction: $2,100,000
Job Start Date: August 2008
Scheduled Completion: January 2009 Project Description: Installing Fireline, Domestic Waterline, Wastewater and Storm Drain Systems.
|
Colorado Crossing
|
Owner: Central Texas Tiltwall
Location: Austin, Tx.
Total Construction: $680,000
Job Start Date: April 2008
Scheduled Completion: September 2008 Project Description: Installation of Fireline, Domestic Water, Wastewater and Storm Drain Systems.
|
1890 Ranch - East
|
Owner: EMJ Corporation
Location: Cedar Park, Texas
Total Construction: >$1,500,000
Job Start Date: January 2008
Scheduled Completion: March 2008 Project Description: Fire Line, Domestic Water Line, Wastewater, HDPE Storm Sewer System, and Wet Pond.
|
Austin Presbyterian Theological Seminary
|
Owner: American Constructors
Location: Austin, Texas
Total Construction: >$300,000
Job Start Date: January 2008
Scheduled Completion: March 2008 Project Description: Fire Line, Domestic Water Line, Wastewater, Storm Sewer, Water Quality Pond, and Detention Pond.
|
Domain Office Building
|
Owner: SpawGlass
Location: Austin, Texas
Total Construction: >$300,000
Job Start Date: February 2008
Scheduled Completion: April 2008 Project Description: Fire Line, Domestic Water Line, Wastewater, Storm Sewer, and Roof Drains.
|
South Fork San Gabriel WW Interceptor PH B and C1
|
Owner: City of Georgetown/Laredo WO, Ltd.
Location: Georgetown, Texas
Total Construction: $15,723,628
Job Start Date: December 2007
Scheduled Completion: October 2008 Project Description: Lewis Contractors, Inc. has been awarded the contract for a new wastewater interceptor in Georgetown Tx. called South Fork San Gabriel Ph. B & C1. This project connects to the South Fork San Gabriel Ph. A project already in progress by Lewis Contractors. This project consists of furnishing and installing 17,591LF of 36" and 4,885LF of 30" Hobas gravity sewer, sewer manholes, bores, trench safety and other miscellaneous items.
|
Lowe's at Leander
|
Location: Leander, Texas
Total Construction: <$300,000
Job Start Date: November 2007
Scheduled Completion: December 2007 Project Description: This project consists of an 8" Fireline, Domestic Water Service, Wastewater Service and a RCP Storm Sewer System.
|
Stone Creek Crossing
|
Location: San Marcos, Texas
Total Construction: <$4,000,000
Job Start Date: October 2007
Scheduled Completion: April 2008 Project Description: This project consists of 1,900 LF of Box Culverts and Junction Boxes. Also included is 17,000 LF of RCP with curb and grate inlets, 12,000 LF of Wastewater Mains and Services, 17,000 LF of Fire and Domestic Water Lines, and Detention Ponds for a new shopping center.
|
South Fork San Gabriel WW Int. Ph. A
|
Owner: City of Georgetown
Location: Georgetown, Texas
Total Construction: $2,091,089
Job Start Date: November 2007
Scheduled Completion: February 2008 Project Description: Lewis Contractors has been awarded a contract for the South Fork San Gabriel River Wastewater Interceptor Phase A. The project consists of instalation of 2,350LF of 42" Hobas gravity sewer and approximately 500LF of 12" PVC sewer. Included are all manholes, connections and the demolition of an existing lift station. This project begins near I-35 and travels west along and near the San Gabriel river bottom.
|
Trisun Nursing Home
|
Owner: Trisun Nursing Homes
Location: Round Rock, Texas
Total Construction: <$150,000
Job Start Date: July 2007
Scheduled Completion: August 2007 Project Description: Installing offsite water and wastewater lines for a nursing home project.
|
Southpark Meadows Apartments
|
Owner: Fairfield Development
Location: Austin, Texas
Total Construction: <$2,000,000
Job Start Date: July 2007
Scheduled Completion: November 2007 Project Description: This project includes installation of domestic waterlines, firelines, wastewater, an RCP storm sewer as well as an HDPE storm sewer system onsite. Also included in this project is a segment of concrete box culverts, a water quality pond, and an offsite water approach main.
|
Manor Elementary School #6
|
Owner: Manor I.S.D.- Baird/Williams Construction
Location: Manor, Texas
Total Construction: <$750,000
Job Start Date: August 2007
Scheduled Completion: November 2007 Project Description: Installation of fire lines, domestic waterlines, wastewater, storm sewer and gas lines on site. Project also includes a water quality pond as well as an offsite wastewater line.
|
IBC-Domain
|
Owner: IBC/ Marshall Company
Location: Austin, Texas
Total Construction: <$150,000
Job Start Date: July 2007
Scheduled Completion: August 2007 Project Description: Installing waterline, wastewater, storm sewer and box culverts for a new bank project.
|
Elgin Middle School
|
Owner: Elgin I.S.D.-Baird/Williams Construction
Location: Elgin, Tx.
Total Construction: >$600,000
Job Start Date: August 2007
Scheduled Completion: October 2007 Project Description: Installation of fire lines, domestic waterlines, wastewater, storm sewer and gas lines for a new middle school.
|
Grace Covenant Church
|
Owner: Grace Covenant Church/VRW Construction
Location: Austin, Texas
Total Construction: <$300,000
Job Start Date: July 2007
Scheduled Completion: October 2007 Project Description: This project includes installation of domestic water lines, fire lines, wastewater lines, a storm sewer system and water quality pond.
|
Sola City Townhomes
|
Owner: Michaux Development LLC
Location: Austin, Texas
Total Construction: <$600,000
Job Start Date: June 2007
Scheduled Completion: November 2007 Project Description: Lewis Contractors is performing utility work on the Sola City Townhomes project. This work includes installation of a new fireline, a domestic waterline, wastewater and storm sewer lines, as well as sleeving.
|
Skybridge Condominiums
|
Owner: Keith Smith
Location: Austin, Texas
Total Construction: >$1,200,000
Job Start Date: June 2007
Scheduled Completion: December 2007 Project Description: Lewis Contractors is performing onsite fireline, domestic water line, wastewater and RCP storm sewer lines for a new condominium project. Also included in our scope of work is a water quality pond, as well as a portion of offsite water line.
|
Sommer Elementary School
|
Owner: Round Rock ISD/American Constructors
Location: Round Rock, Texas
Total Construction: <$600,000
Job Start Date: July 2007
Scheduled Completion: October 2007 Project Description: This project involves installation of onsite firelines, domestic waterlines, wastewater lines, HDPE storm sewer system, and water quality ponds. Utility construction should take around four months to complete.
|
Turtle Creek Elementary School
|
Owner: Round Rock ISD/American Constructors
Location: Round Rock, Texas
Total Construction: >$500,000
Job Start Date: May 2007
Scheduled Completion: July 2007 Project Description: This project involves the installation of new firelines, domestic water, wastewater lines and HDPE storm sewer system for a new elementary school in Round Rock.
|
Leander Elementary #19
|
Owner: Leander ISD/ American Constructors
Location: Austin, Texas
Total Construction: >$400,000
Job Start Date:
Scheduled Completion: Project Description: Lewis Contractors will provide onsite fireline, domestic waterlines, wastewater system and an HDPE storm sewere system for Leander ISD's newest elementary school. Also included in our scope of work will be water quality nad detention ponds for the project site.
|
Farley Middle School
|
Owner: Hutto ISD/Baird Williams Construction
Location: Hutto, Texas
Total Construction: >$650,000
Job Start Date: June 2007
Scheduled Completion: November 2007 Project Description: Lewis Contractors portion of this project involves onsite firelines, domestic water, wastewater, and HDPE storm sewer system for a new school. Also included in our scope of work is a new lift station and sleeving for future utilities.
|
Goodnight Ranch 24" Waterline
|
Owner: City of Austin/ Goodnight Ltd.
Location: S.E. Austin
Total Construction: $880,000
Job Start Date: October 2006
Scheduled Completion: February 2007 Project Description: Installation of approx. 5000LF of 24" Ductile Iron Water Main to service new school and subdivision. Project parallels Knuckles Crossing Rd. before crossing by means of open cut at the school entrance.
|
RMMA/Airport Blvd. WW Project
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $1,453,738
Job Start Date: November 06
Scheduled Completion: July 07 Project Description: This project provides wastewater service from the new RMMA development. Included in project is 1788LF of 15" WW, 904LF of 18" WW and 1479LF of 24" WW. There are 18 new manholes installed in road ROW as well as on RMMA property. This project is installed in Manor Rd as well as Manorwood Rd., and ends on RMMA development site. A bore crossing Airport Blvd. of 176LF is also included in scope of work.
|
Wildhorse Addition 24
|
Owner: City of Austin/Wildhorse Addition LTD
Location: Manor, Texas
Total Construction: $1,114,905
Job Start Date: June 07
Scheduled Completion: Dec 07 Project Description: Project involves 3500LF of 24" ductile iron water main, and approx. 1800LF of 16" ductile iron water main. It also includes valves, fire hydrants, connections to exist. water mains. Also included in project is a 680 LF bore/36" encasement under Hwy 290.
|
East Water Transmission Line PH3B-2
|
Owner: City of Round Rock
Location: Round Rock, Texas
Total Construction: $2,116,004
Job Start Date: June 07
Scheduled Completion: Dec 07 Project Description: This project includes approx. 5400LF of 30" Ductile Iron water pipeline. Also includes 740LF of 42" steel casing pipe by bore, 265LF of 16" water, 1200LF of 12" water, and connections to exist. potable waterlines, appurtenant valves, AARV's etc.
|
Lantana Apartments
|
Owner: Finger Construction
Location: Austin, Texas
Total Construction: >$1,000,000
Job Start Date:
Scheduled Completion: March 2002 Project Description:
|
University of Texas Seay Psychology Building
|
Owner: McCarthy General Contractor
Location: Austin, Texas
Total Construction: >$1,300,000
Job Start Date:
Scheduled Completion: January 2003 Project Description:
|
IBM/Tivoli Systems
|
Owner: HCBeck
Location: Austin, Texas
Total Construction: >$2,500,000
Job Start Date:
Scheduled Completion: February 2003 Project Description:
|
Villages of Sage Creek
|
Owner: Callaway Development Corporation
Location: Austin, Texas
Total Construction: >$1,100,000
Job Start Date:
Scheduled Completion: February 2003 Project Description:
|
Cedar Park Townhomes
|
Owner: Glenn Lynch Companies
Location: Cedar Park, Texas
Total Construction: >$2,500,000
Job Start Date:
Scheduled Completion: March 2003 Project Description:
|
Pleasant Valley Villas Apartments
|
Owner: Affordable Housing
Location: Austin, Texas
Total Construction: <$400,000
Job Start Date:
Scheduled Completion: April 2003 Project Description:
|
Dental Office at Lake Creek Parkway
|
Owner: Bailey Elliott Construction
Location: Austin, Texas
Total Construction: >$150,000
Job Start Date:
Scheduled Completion: May 2003 Project Description:
|
Riverhorse Ranch Apartments
|
Owner: Ocampo Partners, Ltd.
Location: Austin, Texas
Total Construction: <$1,200,000
Job Start Date:
Scheduled Completion: May 2003 Project Description:
|
ShadowGlen 24" Waterline
|
Owner: ShadowGlen Residential Community
Location: Manor, Texas
Total Construction: $910,615
Job Start Date:
Scheduled Completion: May 2003 Project Description: This project installed approx. 8000LF of 24" Ductile Iron in Manor, Texas for the new Shadowglen golf course and subdivision community.
|
Parker Springs Condos
|
Owner: Jencra, Inc.
Location: Austin, Texas
Total Construction: <$500,000
Job Start Date:
Scheduled Completion: May 2003 Project Description:
|
Pleasant Valley Streets & Duplexes
|
Owner: Affordable Housing
Location: Austin, Texas
Total Construction: <$1,000,000
Job Start Date:
Scheduled Completion: May 2003 Project Description:
|
Cedar Creek Intermediate School
|
Owner: HC Beck
Location: Bastrop, Texas
Total Construction: >$250,000
Job Start Date:
Scheduled Completion: June 2003 Project Description:
|
Pioneer Crossing West
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $374,161
Job Start Date:
Scheduled Completion: June 2003 Project Description: Installed approx. 3500LF of 24" Ductile Iron Pipe approach main for the Pioneer Crossing Subdivision.
|
Del Valle Junior High Offsite Water
|
Owner: Del Valle ISD
Location: Del Valle, Texas
Total Construction: $872,445
Job Start Date: January 2003
Scheduled Completion: June 2003 Project Description: This project involved installation of approx. 7500LF of 24" and 16" Ductile Iron Water Line. Also included in project was 2,500LF of 12" Offsite Wastewater Line running parallel and in McKinney Falls Pkwy.
|
Villas of Guadalupe
|
Owner: White Oak Builders
Location: Austin, Texas
Total Construction: >$1,000,000
Job Start Date:
Scheduled Completion: June 2003 Project Description:
|
Morningside Meadows
|
Owner: Nolan Hatcher Construction
Location: Round Rock, Texas
Total Construction: >$100,000
Job Start Date:
Scheduled Completion: July 2003 Project Description:
|
Twin Island Relief Main and Sanitary Sewer Replace
|
Owner: Lewis Contractors. Inc
Location: Lockhart, Texas
Total Construction: $329,683
Job Start Date:
Scheduled Completion: August 2003 Project Description: Installation of 4000LF of 18" sewer interceptor in Lockhart, Tx.
|
Home Depot #6585
|
Owner: White-Spunner
Location: Cedar Park, Texas
Total Construction: <$750,000
Job Start Date:
Scheduled Completion: September 2003 Project Description:
|
East Transmission Main Ph1
|
Owner: City of Round Rock
Location: Round Rock, Texas
Total Construction: $2,378,800
Job Start Date: November 2002
Scheduled Completion: September 2003 Project Description: This project installed approx. 7800LF of 48" Ductile Iron Transmission Main, beginning at the City of Round Rock Treatment plant, and ending near a new elevated storage tank East of I35. Project included five seperate bores under highways and rail road tracks, as well as an open cut of Texas Crushed Stone's main Driveway.
|
Walgreens at SH 45 & AW Grimes Blvd.
|
Owner: Hatcher Construction
Location: Round Rock, Texas
Total Construction: <$700,000
Job Start Date:
Scheduled Completion: October 2003 Project Description:
|
Barton Springs Road WW Line J
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $222,053
Job Start Date: September 2003
Scheduled Completion: October 2003 Project Description: This project consisted of the relaying of about 1000LF of 8" Wastewater Line just north of Barton Springs Rd. in Jesse St. Project also included manhole, service, and asphalt replacements. Innitial installation of pipe fell within the City of Austin schedule of 13 days for substantial completion.
|
Walgreens at Gattis School Road
|
Owner: Nolan Hatcher Construction
Location: Round Rock, Texas
Total Construction: <$250,000
Job Start Date:
Scheduled Completion: November 2003 Project Description:
|
Lakeway Drive WW Improvements
|
Owner: City of Georgetown
Location: Georgetown, Texas
Total Construction: $352,560
Job Start Date:
Scheduled Completion: November 2003 Project Description: This project upgraded sewer service in and along Lakeway Dr. in Georgetown Tx. Project consisted of approx. 3000LF of 15" and 12" WW installation and replacement. Project also replaced several manholes and service lines along pipeline route. Repavement of Lakeway Dr. within the project limits was also performed as part of this project.
|
Double Creek Office Condos
|
Owner: Gavurnik Builders
Location: Round Rock, Texas
Total Construction: >$500,000
Job Start Date:
Scheduled Completion: December 2003 Project Description:
|
Olympic Heights WL
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $504,041
Job Start Date:
Scheduled Completion: March 2004 Project Description: Lewis Contractors installed approx. 7000LF of 16" waterline to a new subdivision in S. Austin.
|
Eagle's Pointe Senior Housing
|
Owner: Shreve Land Construction
Location: Austin, Texas
Total Construction: >$800,000
Job Start Date:
Scheduled Completion: June 2004 Project Description:
|
Elgin High School Athletics Complex
|
Owner: Baird Williams Construction
Location: Elgin, Texas
Total Construction: >$250,000
Job Start Date:
Scheduled Completion: July 2004 Project Description:
|
Village Park Condos
|
Owner: Larry Peel, Inc.
Location: Georgetown, Texas
Total Construction: <$750,000
Job Start Date:
Scheduled Completion: August 2004 Project Description:
|
Cottonwood Creek Subdivision
|
Owner: Baker-Aicklen & Associates
Location: San Marcos, Texas
Total Construction: >$1,500,000
Job Start Date:
Scheduled Completion: November 2004 Project Description:
|
Crate & Barrel
|
Owner: HC Beck
Location: Austin, Texas
Total Construction: <$350,000
Job Start Date:
Scheduled Completion: November 2004 Project Description:
|
Century Park Apartments
|
Owner: Trammell Crow Residential
Location: Austin, Texas
Total Construction: <$2,000,000
Job Start Date:
Scheduled Completion: November 2004 Project Description:
|
Pearce Lane 36" Waterline Improvements
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $2,289,788
Job Start Date: July 2004
Scheduled Completion: December 2004 Project Description: The Pearce Ln. 36" waterline project consisted of 10000LF of 36" restraint joint ductile iron pipe. The project began by connecting to a 24" watermain running along Pearce Ln. The line then traveled along the edge of Elroy Rd. for approx. 1 mile. The line then travels cross country for approx. 4000 additional feet before connecting to an existing 36" line. This was also the first project in the City of Austin that was allowed to use 36" RW gate valves, which made for a quick and easy installation.
|
Burnet High School
|
Owner: American Constructors, Inc.
Location: Burnet, Texas
Total Construction: <$1,000,000
Job Start Date:
Scheduled Completion: January 2005 Project Description:
|
Wells Fargo Bank at Parmer Lane
|
Owner: Bailey Elliott Construction
Location: Austin, Texas
Total Construction: >$250,000
Job Start Date:
Scheduled Completion: January 2005 Project Description:
|
Raw Water Line Relocation at Hwy 29
|
Owner: City of Round Rock
Location: Georgetown, Texas
Total Construction: $1,931,804
Job Start Date: October 2004
Scheduled Completion: March 2005 Project Description: An existing 30" Raw Water line for the City of Round Rock ran parallel to Hwy. 29 in Georgetown. When widening of Hwy. 29 was implemented, the 30" line had to be relocated. Lewis Contractors won the contract to relocate this line. The project started on the SW corner of I-35 and Hwy 29, bores north across Hwy 29, then opens cuts along and in a county road. A portion of the line travels across country before reconnecting with the 30" line just east of D.B. Woods Rd. The 30" line was upsized to 42" Ductile that was supplied by ACIPCO. Upon completion of the 42" line, the 30" line was removed to facilitate the widing of Hwy. 29.
|
Domain Ph-1
|
Owner: HC Beck
Location: Austin, Texas
Total Construction: >$850,000
Job Start Date:
Scheduled Completion: June 2005 Project Description: This project installed a new box culvert storm sewer system for the Domain development.
|
Raw Waterline Relocation at Cottonwood
|
Owner: Guadalupe Blanco River Authority
Location: San Marcos, Texas
Total Construction: $157,500
Job Start Date: July 2005
Scheduled Completion: July 2005 Project Description: This project included approx. 300LF of 30" Ductile Iron Raw Water Relocation for Guadalupe Brazos River Authority. Waterline had to be offset and lowered to facilitate a driveway for a new subdivision and elementary school. This project was allowed 45 days to final completion, but only took Lewis Contractors 8 days to reach final completion status.
|
Walgreen's at Bastrop
|
Owner: Hatcher Construction
Location: Bastrop, Texas
Total Construction: >$200,000
Job Start Date:
Scheduled Completion: July 2005 Project Description:
|
IH 35 Wastewater Improvements Phase II
|
Owner: Baker-Aicklen & Associates
Location: San Marcos, Texas
Total Construction: <$600,000
Job Start Date:
Scheduled Completion: July 2005 Project Description:
|
Hutto High School Improvements
|
Owner: Baird Williams Construction
Location: Hutto, Texas
Total Construction: <$25,000
Job Start Date:
Scheduled Completion: July 2005 Project Description:
|
IH 35 Wastewater Phase I
|
Owner: Baker-Aicklen & Associates
Location: San Marcos, Texas
Total Construction: >$1,100,000
Job Start Date:
Scheduled Completion: August 2005 Project Description:
|
CCR 103
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $858,292
Job Start Date: April 2005
Scheduled Completion: November 2005 Project Description: The Circle C Ranch 103 project included around 5000LF of 16" ductile iron approach main for a new shopping center at Slaughter Ln. and Escarpment Blvd. The Line paralled Slaughter Ln. then Bored under Slaughter Ln. for almost 600LF, then proceeded North along the Escarpment Blvd. extension. Also included with this project was a portion of 12" and 8" waterline, along with several stub outs to future shopping center pad sites.
|
St. Edwards Residence Hall- Phase II
|
Owner: VRW Construction
Location: Austin, Texas
Total Construction: >$200,000
Job Start Date:
Scheduled Completion: August, 2005 Project Description:
|
Pflugerville HS Athletic Field
|
Owner: Baird Williams Construction
Location: Pflugerville, Texas
Total Construction: <$100,000
Job Start Date:
Scheduled Completion: August, 2005 Project Description:
|
Kelly Lane Middle School
|
Owner: Baird Williams Construction
Location: Pflugerville, Texas
Total Construction: >$500,000
Job Start Date:
Scheduled Completion: August 2005 Project Description:
|
IBC Bank
|
Owner: Marshall Company
Location: Cedar Park, Texas
Total Construction: >$50,000
Job Start Date:
Scheduled Completion: November 2005 Project Description:
|
Highland Park Elementary
|
Owner: Baird Williams Construction
Location: Pflugerville, Texas
Total Construction: <$400,000
Job Start Date:
Scheduled Completion: January 2006 Project Description:
|
Hutto Elementary #2
|
Owner: Baird Williams Construction
Location: Hutto, Texas
Total Construction: >$50,000
Job Start Date:
Scheduled Completion: December 2005 Project Description:
|
Walgreen's at Hesters Crossing
|
Owner: Workman Commercial
Location: Round Rock, Texas
Total Construction: <$350,000
Job Start Date:
Scheduled Completion: December 2005 Project Description:
|
Iris Interceptor
|
Owner: City of Cedar Park
Location: Cedar Park, Texas
Total Construction: $250,979
Job Start Date: August 2005
Scheduled Completion: December 2005 Project Description: This project installed approx. 1200LF of 12" Wastewater Line in existing creek. The project also included one road bore, and the abandonment of an existing lift station from Milburn Park.
|
Villages of Bella Vista
|
Owner: Callaway Construction
Location: Austin, Texas
Total Construction: <$3,000,000
Job Start Date:
Scheduled Completion: January 2006 Project Description:
|
Round Rock Retirement Residence
|
Owner: Colson&Colson
Location: Round Rock, Texas
Total Construction: >$1,000,000
Job Start Date:
Scheduled Completion: March 2006 Project Description:
|
St. Edward's University Parking
|
Owner: Bailey Elliott Construction
Location: Austin, Texas
Total Construction: <$100,000
Job Start Date:
Scheduled Completion: April 2006 Project Description:
|
JCPenny at Tech Ridge Center
|
Owner: Whiting Turner
Location: Austin, Texas
Total Construction: >$400,000
Job Start Date:
Scheduled Completion: June 2006 Project Description:
|
Hudson Bend Middle School
|
Owner: American Constructors
Location: Austin, Texas
Total Construction: <$200,000
Job Start Date:
Scheduled Completion: March 2006 Project Description:
|
Blake Manor Elementary
|
Owner: Baird/Williams Construction
Location: Austin, Texas
Total Construction: <$500,000
Job Start Date:
Scheduled Completion: March 2006 Project Description:
|
Guadalupe Condo's
|
Owner: White Oak Builders
Location: Austin, Texas
Total Construction: >$150,000
Job Start Date:
Scheduled Completion: April 2006 Project Description:
|
Onion Branch Relief Main
|
Owner: LCRA
Location: Round Rock, Texas
Total Construction: $1,665,942
Job Start Date: August 2005
Scheduled Completion: March 2006 Project Description: Onion Branch Relief Main was a 24" Wastewater Interceptor completed for the LCRA. The project involved 5000LF of 24" FRP installed at depths ranging from 15' to 32'. The project began along Brushy Creek Rd., crossed the creek, then traveled across country crossing another creek, until reaching FM 3406. The crossing of FM 3406 was achieved by bore before the final 600LF was open cut. Project also included a 15" main and manhole replacement.
|
East Crystal Falls 24" Water Main PH1
|
Owner: City of Leander
Location: Leander, Texas
Total Construction: $866,613
Job Start Date: May 2006
Scheduled Completion: July 2006 Project Description: Project highlights include 3800 LF of 24" Ductile Iron Water Main in Crystal Falls Rd. ROW, including 800 Lf installed in steel encasement under US-183A. Line was extended to serve new middle school and high school site as well as for future water service for the East side of Leander.
|
Shps at Arbor Walks
|
Owner: VCC
Location: Austin, Texas
Total Construction: <$5,000,000
Job Start Date:
Scheduled Completion: August 2006 Project Description:
|
St. Edward's Alumni Parking
|
Owner: Bailey Elliott
Location: Austin, Texas
Total Construction: <200,000
Job Start Date:
Scheduled Completion: August, 2006 Project Description:
|
ARC Skilled Nursing
|
Owner: Nashville Constructors
Location: Lakeway, Texas
Total Construction: <$300,000
Job Start Date:
Scheduled Completion: August 2006 Project Description:
|
San Marcos HS
|
Owner: American Constructors
Location: San Marcos, Texas
Total Construction: >$1,700,000
Job Start Date:
Scheduled Completion: September 2006 Project Description:
|
RM 1431 Utility Relocates
|
Owner: City of Cedar Park
Location: Cedar Park, Texas
Total Construction: $297,398
Job Start Date: September 2006
Scheduled Completion: November 2006 Project Description: This project relocated to 36" ductile iron segments, as well as installed 1100LF of 15" Wastewater line to facilitate the widening of RM 1431.
|
Wildhorse Interceptor
|
Owner: City of Austin
Location: Manor, Texas
Total Construction: $4,072,095
Job Start Date: January 2006
Scheduled Completion: October 2006 Project Description: This project involved almost 12000 LF of 27 and 30" Wastewater Interceptor, with depths ranging from 15 to 32 feet. The line started at the new COA NE Wwastewater treatment plant, ran across country to Blue Bluff Road, then crossed SH 130 at Blue Bluff Rd. After that it ran for approx. 2000 feet in SH-130 ROW then contiued across country in the CAPMETRO RR ROW. 2200 LF of 27" interceptor parallels the Railroad tracks which is installed by tunnel. The tunnel portion included 5 reach pits varying in depth from 23' to 47'.
|
Loop 1 Extension
|
Owner: City of Austin/ TXDoT/ Zachry/Gilbert
Location: Austin, Texas
Total Construction: $10,548,720
Job Start Date: December 2003
Scheduled Completion: April 2006 Project Description: In the summer of 2003, Lewis Contractors was awarded an almost $10Mil contract by the joint venture Zachry/Gilbert Constructors. Our portion of the project involved relocating numerous water and wastwater lines to facilitate the conversion of 1325 to the new Loop 1 tollroad. Installation of app. 15000Lf of 48" and 54" Ductile Iron which relocated an exist. 36" line out of the future roadway alignment highlighted this project. Several tie-in's and interconnects were required as multiple lines serviced off of these large mains. In addition around 12000LF of 12" Ductile as well as numerous runs of 16"-36" Ductile Iron piping were also relocated. There were also approx. 10000LF of Wastewater relocations in sizes ranging from 8" to 18" that had to be made. This project also required 32 seperate bores/tunnels and numerous street open cuts to achieve completion.
|
Lindell Lane 24" Water Imps.
|
Owner: City of Austin
Location: Manor, Texas
Total Construction: $1,293,793
Job Start Date: July 2006
Scheduled Completion: November 2006 Project Description: 7900 Lf 24" Ductile Iron water transmission main was installed by Lewis Contractors for Wildhorse Ltd. The project began North of Hwy. 290, was installed in an open cut casing across 290/ SH 130, then traveled South down Decker Lane. Decker Lane was bored, then the line continued traveling across country, bored the CAPMETRO RR,again traveled across country before terminating at new development site. Project included all valves, AARV and other appurtances necessary.
|
Asian Market Offsite
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $166,541
Job Start Date: July 2006
Scheduled Completion: November 2006 Project Description: This project installed 500 LF of 8" WW line across Braker Lane, tying to an existing COA manhole. Included all asphalt and concrete repairs associated with resoration of site to original condition.
|
Domain Offsite Sewer
|
Owner: HC Beck
Location: Austin, Texas
Total Construction: $1,342,855
Job Start Date: June 2006
Scheduled Completion: December 2006 Project Description: This project extends sewer service from the new Domain Development just north of Braker Ln. on N. Mopac in Austin, to an interceptor line West of Mopac. The project involved 1100LF of 15" Wastewater Line, with 516LF in a 42" steel casing bored under Mopac Exwy. An additional 240' was bored under a creek West of Mopac.
|
Round Rock Retail Center
|
Owner: Leonard Contracting
Location: Round Rock, Texas
Total Construction: <$400,000
Job Start Date: November 2006
Scheduled Completion: February 2007 Project Description:
|
Goodnight WW Line Imps.-East
|
Owner: City of Austin/Austin Goodnight Ranch LP
Location: Austin, Texas
Total Construction: $388,197
Job Start Date: January 2007
Scheduled Completion: May 2007 Project Description: Project consisted of 3900LF of 15" Waste Water Line to service a new elementary school. Depths of project ranged from 10' to 22'.
|
Verde Apartments @ Brushy Creek
|
Owner: Verde Apartment Communities
Location: Cedar Park, Texas
Total Construction: >$1,500,000
Job Start Date: January 2007
Scheduled Completion: December 2007 Project Description: This project is located along Brushy Creek Rd. in Cedar Park. The project includes a 24" offsite water line, onsite fire lines, domestic lines and wastewater lines. Concrete Box Culverts were also installed as part of the storm drain system. Lewis Contractors is also performing all site clearing, site cuts and fills, building pads, paving subgrade, and site grading, as well as onsite water quality ponds. This project is scheduled to be finished by the end of 2007.
|
Meadowheath Lift Station Decom. & 15" WW Line
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $263,605
Job Start Date: November 2006
Scheduled Completion: March 2007 Project Description: Project invovled 1200LF of 15" sewer main in existing roadway. Also included service reconnections and abandonment of existing lift station.
|
Manor High School
|
Owner: Baird / Williams Construction
Location: Manor, Texas
Total Construction: <$100,000
Job Start Date: November 2006
Scheduled Completion: May 2007 Project Description:
|
Villas @ Steiner Ranch
|
Owner: JO'B Site Construction
Location: Austin, Texas
Total Construction: >$300,000
Job Start Date: September 2006
Scheduled Completion: May 2007 Project Description:
|
Leander HS #4
|
Owner: American Constructors
Location: Leander, Texas
Total Construction: >$3,000,000
Job Start Date: September 2006
Scheduled Completion: August 2007 Project Description: Lewis Contractors is performing underground utilty work for American Constructors on Leander ISD's newest High School just North of Crystal Falls Pkwy. in Leander. This project includes approx. 5400LF of Fire line, 7500LF of Domestic Water line and 5100LF of Wastewater lines. Also included is approx. 16700LF of water tight HDPE Storm Sewer installation, as well as Detention Pond Work.
|
Ray Elementary School
|
Owner: Baird / Williams Construction
Location: Hutto, Texas
Total Construction: >$350,000
Job Start Date: September 2006
Scheduled Completion: May 2007 Project Description: This project includes installation of all Fire Lines, Domestic Water Lines, Wastewater, Storm Sewer, Detention Ponds and Irrigation Sleeves necessary for the construction of a new elementary school for Hutto ISD.
|
South Central Elementary
|
Owner: VRW Construction
Location: Austin, Texas
Total Construction: <$250,000
Job Start Date: August 2006
Scheduled Completion: May 2007 Project Description:
|
Cedar Park Hospital
|
Owner: BE & K Building Group
Location: Cedar Park, Texas
Total Construction: <$750,000
Job Start Date: June 2006
Scheduled Completion: May 2007 Project Description:
|
AMD Lantana
|
Owner: Austin Commercial
Location: Austin, Texas
Total Construction: >$2,000,000
Job Start Date: August 2006
Scheduled Completion: June 2007 Project Description: Lewis Contractors is performing underground utilities for the new AMD site in SW Travis Co. We were awarded a contract and are working for Austin Commercial. The project includes installation of a 12" Fire Line, Domestic Water and Wastewater lines onsite. Also included with this project is a Storm Drain system, rainwater collection system, Re-Irrigation Pumps and Several Water Quality Ponds. Construction should be complete Summer of 2007.
|
Gables Westlake
|
Owner: Gables Residential
Location: Austin, Texas
Total Construction: >$1,500,000
Job Start Date: January 2007
Scheduled Completion: December 2007 Project Description: Lewis Contractors is performing this site project for Gables Residental. The project includes all onsite firelines, domestic waterlines, wastewater lines and storm sewer system. Also included in this project is 12" & 16" offsite water mains, as well as offsite storm sewer and sanitary sewer lines. We are also installing water quality ponds for this site.
|
Triad Subdivision
|
Owner: Ranger Excavating
Location: Cedar Park, Texas
Total Construction: >$1,000,000
Job Start Date: June 2006
Scheduled Completion: April 2007 Project Description:
|
Dripping Springs Elementary
|
Owner: American Constructors
Location: Dripping Springs, Texas
Total Construction: >$500,000
Job Start Date: June 2006
Scheduled Completion: April 2007 Project Description:
|
ACWP Downtown/Whitehorse Trail WW Imps. PH2
|
Owner: City of Austin
Location: Austin, Texas
Total Construction: $1,519,133
Job Start Date: October 2006
Scheduled Completion: July 2007 Project Description: This project includes 3200LF of 8" WW line replacement in a tributary of Shoal Creek, along with several manhole relocations and replacements. Project includes several road crossings, service reconnection and channel regrading, including revegetation and rock rip-rap.
|
The Woodlands Sect.1 Lift Sta. & Offisite WW Imps.
|
Owner: City of Austin/Centex Homes
Location: Austin, Texas
Total Construction: $1,055,998
Job Start Date: August 2006
Scheduled Completion: July 2007 Project Description: This project provides a new lift station and wastewater lines for a new subdivision.
|
Dickey Street Drainage
|
Owner: City of Taylor
Location: Taylor, Texas
Total Construction: $899,323
Job Start Date: August 2006
Scheduled Completion: April 2007 Project Description: This project included approx. 1200LF of 8x5 Box Culvert in an existing street. Project also included approx. 1000LF of 54" & 42" RCP Storm Drain. Depths of cuts averaged 18' with some in excess of 20'.
|
First National Bank
|
Owner: XLNT
Location: Austin, Texas
Total Construction: <$100,000
Job Start Date: September 2006
Scheduled Completion: March 2007 Project Description:
|
Long Center for the Performing Arts
|
Owner: Austin Commercial
Location: Austin, Texas
Total Construction: <$400,000
Job Start Date: October 2005
Scheduled Completion: March 2007 Project Description:
|
Round Rock Retail Phase II
|
Owner: Leonard Contracting
Location: Round Rock, Texas
Total Construction: <$500,000
Job Start Date: February 2007
Scheduled Completion: May 2007 Project Description:
|
Parker Lane Senior Housing
|
Owner: White Oak Builders
Location: Austin, Texas
Total Construction: >$200,000
Job Start Date: January 2007
Scheduled Completion: May 2007 Project Description:
|
Leander Elementary #18
|
Owner: American Constructors
Location: Austin, Texas
Total Construction: >$1,300,000
Job Start Date: January 2007
Scheduled Completion: December 2007 Project Description: This project included new fire lines, domestic water lines, wastewater lines and a water tight HDPE storm sewer system for a new elementary school. Also included with this project are offsite RCP storm sewer lines, offsite wastewater lines along with a new wastewater lift station. Water quality ponds are also being installed by Lewis Contractors.
|
Esperanza Drive
|
Owner: SpawGlass
Location: Austin, Texas
Total Construction: >$1,000,000
Job Start Date: January 2007
Scheduled Completion: December 2007 Project Description: This project included a 16" water line. There are also 12" & 10" Wastewater lines, a RCP and Concrete Box Culvert system, and all irrigation sleeving were included as part of this project.
|
IBC Bank
|
Owner: Marshall Company
Location: Austin, Texas
Total Construction: <$150,000
Job Start Date: March 2007
Scheduled Completion: June 2007 Project Description:
|
San Antonio International Airport Proj. 6
|
Owner: City of San Antonio/ Archer Western Contractors
Location: San Antonio, Texas
Total Construction: $3,628,297
Job Start Date: March 2007
Scheduled Completion: September 2008 Project Description: Lewis Contractors, Inc was awarded a portion of the San Antonio Airport Project 6 by Archer Western Contractors. Lewis Contractors portion of the contract includes 8" and 12" Water line relocations. Also included is a new wastewater line to service a future terminal building in sizes ranging from 8" - 16". Approx. 1600 Lf of this line will installed by bore to minimize disruptions. Also, a new storm drain system will be installed in and near existing roadways to provide drainage for new roadways and bridges provided by Archer Western Contractors.
|
|